I didn't get much done this weekend because of visiting family but the three main wall pieces are done with low poly pieces and maps baked for two of them, the third will be baked shortly. I'm going to start looking into the stained glass effect if possible and trying to finish the back wall so that it can be placed as well. The only pieces I have left are the floor, the ceiling, and the pedestal (as well as the glass and wall mentioned above). Hopefully I'll be able to make more progress this weekend and try to catch up to where I should be at.