This week I focused on retopology for the pedestal, I unfortunately ran into a few issues doing so but eventually got it all sorted out (oh Zbrush...) the new topology for the pedestal has been projected on and is now ready to continue into the final sculpting phase and then eventually map baking. The second image is of the high poly version of two of the walls for the enclosed area that the pedestal will be held in with the stained glass, the top two pieces are of the straight left wall while the bottom two are for the front wall that is mostly missing. The front wall has been retopologized and is in the process of having maps baked and diffuse created. Next I still have the ceiling, the right wall, the dome for the ceiling (if it gets seen, it may be combined with the ceiling via dynamesh and then sculpted on), the floor, and possibly corner pieces or rounded destroyed arch ways to sit right outside of the enclosed area. The stained glass still has to be done as well but it shouldn't need any type of high poly sculpting.



No comments:

Post a Comment